True/False Indicate whether the statement is true or false.
|
|
1.
|
Once the design of a fiber optic project is
complete and documented, the bulk of the work is done.
|
|
2.
|
While the Project Manager is the most important person in the project, there
must be a backup person so there is a contact available, often 24/7, during the project.
|
|
3.
|
It is not necessary for the on site supervisor to inspect and verify test
results until the final stage of the project.
|
Multiple Choice Identify the choice that best completes the statement or
answers the question.
|
|
4.
|
Planning a project properly includes creating a ________ before beginning the
design process.
A. | Notebook | B. | CAD drawings | C. | List of responsible
personnel | D. | Checklist |
|
|
5.
|
___________ determines that the project was installed correctly.
A. | The sign-off by the project manager | B. | Compeltion of the last
installations | C. | Test data showing all links properly installed | D. | Acceptance by the
customer |
|
|
6.
|
The most important thing you can have when trying to restore a fiber optic
network is ___________.
A. | OTDR | B. | Visual fault locator | C. | Truck | D. | Documentation |
|
Multiple Response Identify one or more choices that best complete the
statement or answer the question.
|
|
7.
|
During the project, it may be necessary to work with ________ to complete the
project. (Check all that apply)
|
|
8.
|
To do a proper restoration on a buried OSP cable, you are going to need the
following equipment and supplies in addition to the documentation.(Check all that are
necessary)
|